Solar panels that cost less than $1 per watt to produce are on their way, as Colorado State University's new method for low-cost, high-efficiency solar panels looks set to begin mass production. The panels will be made by AVA Solar, and production should start towards the end of next year at a huge factory employing 500 people.

The cost reduction comes from the new, continuous manufacturing process which uses cadmium telluride thin film rather than the more expensive crystalline silicon. Once manufactured, the cost to buyers could be brought down to $2 per watt, which is roughly half the current cost of solar panels.

The process is also greener, with less wastage than previous systems. Only 2% of materials need to be recycled. "This technology offers a significant improvement in capital and labor productivity and overall manufacturing efficiency," said the director of Colorado State's Materials Engineering Laboratory, Professor W.S. Sampath.

Source: "New Low Cost Solar Panels Ready for Mass Production", Industry Week

 

 

 

 

 

 

 

 

 

 


  HVAC
 
  Plumbing
 
  Energy Efficiency
 
Renewable Energy
 
  Electrical/Power/
Lighting
 
  Roofing
 
  Walls/Paint/Flooring
 
  Structural/Insulation/
Siding
 
  Windows
 
  Mold/Moisture
 
  Software
 
  Disaster-Resistance
 
  Miscellaneous
 

 

Contact us if you have a new technology or innovation for marketing services.


Facebook Twitter LinkedIn YouTube
Site created by Purple Clover Design

Newport Partners, LLC
Ph: (301) 889-0017 • Fax: (301) 889-0019
GSA Schedule